There was an electrical issue at the building electrical cabinet. Took a little bit of time for electrical contractor to arrive during Holiday sunday-monday night.At roughly 01:45AM local time one of the phases went down on one of the electrical feeds we have. This caused a cascade on cooling side since 3-phase chillers need all 3-phases.The issue ... Leia mais... »
There was an configuration mistake leading to less uplink capacity on LT5 than expected.
This was noticed as during the past couple days the rack has hit maximum usage for the first time.
This is now fixed and there is much more uplink capacity on the rack.
The ALL New M1000 Ryzen SSD series has just been released!
It offers all AMD Ryzen CPU servers with big traffic ratios! We even managed to keep the users per server amounts quite decent.
Check it all out at: https://pulsedmedia.com/m1000-ssd-seedbox.php
There is some network maintenance work being done today, there maybe intermittent few minute issues as we work with the networking side.