We are expecting a server or two still today, and more during the weekend, backlog should be cleared by sunday night.
We have decided it makes absolutely no sense to invest into last generation or older hardware, despite their cheap buy in cost. Namely because they offer both lower performance and higher electricity consumption, along with very short lifespan. Therefore the upcoming 2G plan will be very restricted supply and not part of the main ... Devamını Oku »
Sorry, we have not been able to setup new Super100 offers in couple of days as we are waiting for new nodes to arrive.
Usually new nodes will be ready within 24hrs, but the DC ran out of nodes so we must wait for new ones.
I know you guys are anxiously waiting, and we are hoping that backlog will be cleared by end of this week.
After more than a month in waiting, finally the last of testing gear arrived. 3 big boxes of precious hardware. The two testing nodes are minimally configured. AMD 6core 3.3Ghz CPU, 8Gb DDR3 ECC, 5x3Tb Cuda, 1x256Gb SSD Cache, 2x32Gb SSD Boot drives, Highpoint raid controller for cache drives, basic RAID controller for the boot drives. Final ... Devamını Oku »