Our first transit link should be up and operational tomorrow. Our IP Block got assigned already. Netboot/iSCSI boot is still undone, but first storage brick is now stable and final configuration. i3s require 19VDC power input, a oversight in design, it was assumed they have wide input as well, so these will be delayed until late next week to get ... Davamını oxu »
When you are doing a build out like ours - so many new things, and taking certain things to extremes there is bound to be unexpected things happening. After several days of issues with a storage brick we noticed the SATA Raid controller was not compatible with this specific SSD model and make. Then basic SATA power connectors failing one after ... Davamını oxu »
SAN is almost complete now, some configurations remain to be done, but physical layer is complete. Cogent assigned today our 10Gbase-LR port and are waiting for demarcation information, after that, PtP connection between the buildings is done and we can setup the public network. Further, we developed our own temperature & climate monitoring ... Davamını oxu »
If you have older generation PDS, or other dedicated server you may upgrade to it, the process is as follows: - order and pay the new server- Once server is setup we will adjust your service due date accordingly- You may now migrate over to the new one, or we can attempt a mirror copy- Once migrated, you may opt for prorata refund or days ... Davamını oxu »