Very initial results are in. Storage server: FX-6100 AMD CPU (6 core)16G DDR3 ECC Kingston4x3Tb Seagate Barracuda 7200RPM (Integrated SATA3 controller)1xSamsung 840 PRO (Highpoint SATA3 RAID Controller)Integrated 1Gbps network connection Via 2xHome 1Gbe switches (cheap)Using subspecification network cabling (poor condition) Testing ... Davamını oxu »
We are expecting a server or two still today, and more during the weekend, backlog should be cleared by sunday night.
We have decided it makes absolutely no sense to invest into last generation or older hardware, despite their cheap buy in cost. Namely because they offer both lower performance and higher electricity consumption, along with very short lifespan. Therefore the upcoming 2G plan will be very restricted supply and not part of the main ... Davamını oxu »
Sorry, we have not been able to setup new Super100 offers in couple of days as we are waiting for new nodes to arrive.
Usually new nodes will be ready within 24hrs, but the DC ran out of nodes so we must wait for new ones.
I know you guys are anxiously waiting, and we are hoping that backlog will be cleared by end of this week.